Custom Fire Pits

Want a custom fire pit to fit your interests or personality?  We can design and build a custom fire pit just for you or for a gift for friends and family!  Our engineering team can help with the design and the team at Nix Equipment will fabricate the fire pit, followed by the Coatings team […]

Custom Industrial Tote Carts

Our team worked together to produce these Tote Carts for one of our manufacturing customers. Our engineering team designed the Tote Carts, working closely with the customer to understand their specific needs and requirements. Once the design phase was complete, our fabrication shop took charge of processing the materials and fabricating the Tote Carts. Our […]

Manitowoc 888 Crane Refurbishment

Our Mobile Coatings crew has been hard at work onsite in Kentucky refurbishing this Manitowoc 888 Crane.  Our experienced technicians worked diligently to restore this crane to its original condition.   Thanks to our crew for exceeding our customers expectations!

Coal Conveyor

A Coal Conveyor Project by the Structural Fabrication Division.

Trailer Refurbishment

Proper equipment maintenance will not only increase the life and value of your fleet, but also promotes safety. Let Nix provide you with a plan to bring your equipment back to new with our extensive list metal repair, mechanical, and coatings services.

Vertical Plastics Mixer

The teams at Nix Metals and Nix Coatings fabricated, coated, and installed this vertical plastics mixer for our customer.

Tank Refurbishment

The Nix Mobile Coatings crew did an excellent job on two 800,000+ gallon limestone slurry tanks.   This project includes sandblasting, grouting, and  applying a two coat liquid paint system.

Epoxy Floor Coatings

The Mobile Coatings crew hand prepared and applied an epoxy floor coating at this waste water treatment.  Their attention to detail and quality provided a durable flooring solution for our customer.

Mobile Coatings – Secondary Containment

The team from Nix Mobile Coatings recently completed a transformation of an existing concrete secondary containment.  The process involved first cleaning the concrete with high pressure water, then applying a plural component system designed to seal the concrete and cracks to prevent any future failures.  The project was finished off with a rolled on concrete […]